CONSTRUCTION STATUS: TAXILANE N

This project will temporarily impact hangar and ramp access for many tenants on the east side of the airport, as well as transient aircraft. While efforts may be made to accommodate access when practical and safely possible, it is important to plan your operations and activities accordingly. Safety and the efficient flow of aircraft are among our highest priorities.  

For assistance or to report a safety concern, please call Airport Operations at 303-877-7307.

DASHBOARD CURRENT AS OF: MONDAY, MAY, 18, 2020 | 1300L (DGS)

Download the TAXILANE N PROJECT DIAGRAM.


Monday
May 20, 2020
Construction crews are tenatively planning a test strip for June 5 - June 8. This will affect access to Executive Hangars #2 (GOLD 21). No other significant closures are scheduled at this time. (DGS)

CONSTRUCTION STATUS: RWY 17R/35L and TWY B

This project will temporarily impact operations on the field. Expect congestion, unusual taxi instructions. Watch for flaggers and equipment and report all safety concerns immediately.

For assistance or to report a safety concern, please call Airport Operations at 303-877-7307.

DASHBOARD CURRENT AS OF: MONDAY, MAY, 18, 2020 | 1300L (DGS)

 


Monday
JUNE 8, 2020
Construction crews will be preparing for rsurface closure. (DGS)

CONSTRUCTION STATUS: EAST CONTROL TOWER ROAD

This project will temporarily impact operations on the east side of the airport. Expect congestion. Watch for flaggers and equipment and report all safety concerns immediately.

For assistance or to report a safety concern, please call Airport Operations at 303-877-7307.

DASHBOARD CURRENT AS OF: MONDAY, MAY, 18, 2020 | 1300L (DGS)

 


Monday
MAY 18, 2020
Start dates for this project are to be determined. (DGS)